Project Maranatha
Construction Project in Narasaraopet, South India
The walls are up .................. WOW ............ and the outside stucco work is completed along with the painting. The following are projects needing you support so we can begin to seek out Street Children. We are hoping to fit 4 bunk beds in the children's room. Joe asked Kiran (President for The Maranatha Foundation) how long it would take him to find 8 children. His answer was frank and quick, "From 30 minutes to an hour." Do you understand that statement. If you do not quite get it, check out the India Statistics' page. Did you read how many are out there? All you need to do, once the building is ready, is inform us of your support and begin sending it for we will have a child prior to your first check getting to our Corporate Office.
The following projects are primarily in the order of completion. If you want to send support for a future small or large project, you just put that on your check, money order, or PayPal donation your designated project name.
< > Completed Projects < > Up to May 2013
< > Stucco all exterior walls
< > Paint total 2 story house Outside
< > Bathroom Floors Raised
< > Plastering of All Interior Halls
< > Security Door to Roof Completed
< > Install Doors .... Patio & Front Door & Hardware
< > Next scheduled Projects
< 1 > Paint Bathroom………………………………………….…………………............…….. $80.00 Total
< 1 > Bathroom………...................… Door, Toilet & Showering Fixtures……………….. $200.00 Total
< 2 > Front Window Glass………..…….. With Security Bars……………………….……. $100.00 Total
< > Electrical Trim……………...………… Light Fixtures, Switches, Covers, Outlets. $450.00 Total
< 11 > windows (Glass) & screens……………………………………...…………………… $600.00 Total
Future Projects 1:
< 1 > A/C..................................................Visitor's Room.....................................................$290.00 One
< 2 > Ceiling Fans with Lights..............Visitor & Parent's Room......................................$90.00 Each
< 4 > Door to rooms………………………Kid's & Visitor Bathroom,Parent's………….....$600.00 Each
< 1 > Twin Bed………………………….…...Visitor's room...………………………………......$450.00 Total
< 1 > Double bed………………………......Parent's room…………...………………………...$250.00 Total
< 2 > Pre-Built closets...........................Visitor & Parent's rooms………………………....$250.00 Each
< 1 > Computer Desks For....................Parent's room………………………………...........$200.00 Total
Future Projects 2:
< 2 > Trim Bathrooms……………… ..…….Sink Cabinets, Faucets, Shower Heads….............. $400.00
< 2 > Mirrors…………………………………Both Bathrooms and Hall Sinks……………............. $300.00
< > Paint rest of 2nd Floor…………….....Interior Walls…………………………………......…… $200.00
< > All flooring finished………………......Tiled……………………………………………………$2,500.00
This will complete the construction project except for the kitchen. Later after we have children we will finish the kitchen with your support and until then the host family will prepare meals from their kitchen.
Immediate needs following the construction completion.
4 Bunk beds ......................................... Estimated $250 each
They will have built in drawers under the lower bunk for their personal items.
Bedding for 8 twin beds .......................................... $30 each
need 2 pair for each for one set being washed and dried (with double pillow cases.)
8 Pillows ..................................................................$10 each
16 sets of wash clothes and towels .......................... $6/set
Toiletries for up to 8 boys ... bars of soap, shampoo, combs, tooth brushes and tooth paste, tooth brushes last about one month per child as there is no water pressure to systematically clean them properly.
Sleeping mats one per child .......................................................................... $10
Other items will be added as they are identified and priced.
The following projects are primarily in the order of completion. If you want to send support for a future small or large project, you just put that on your check, money order, or PayPal donation your designated project name.
< > Completed Projects < > Up to May 2013
< > Stucco all exterior walls
< > Paint total 2 story house Outside
< > Bathroom Floors Raised
< > Plastering of All Interior Halls
< > Security Door to Roof Completed
< > Install Doors .... Patio & Front Door & Hardware
< > Next scheduled Projects
< 1 > Paint Bathroom………………………………………….…………………............…….. $80.00 Total
< 1 > Bathroom………...................… Door, Toilet & Showering Fixtures……………….. $200.00 Total
< 2 > Front Window Glass………..…….. With Security Bars……………………….……. $100.00 Total
< > Electrical Trim……………...………… Light Fixtures, Switches, Covers, Outlets. $450.00 Total
< 11 > windows (Glass) & screens……………………………………...…………………… $600.00 Total
Future Projects 1:
< 1 > A/C..................................................Visitor's Room.....................................................$290.00 One
< 2 > Ceiling Fans with Lights..............Visitor & Parent's Room......................................$90.00 Each
< 4 > Door to rooms………………………Kid's & Visitor Bathroom,Parent's………….....$600.00 Each
< 1 > Twin Bed………………………….…...Visitor's room...………………………………......$450.00 Total
< 1 > Double bed………………………......Parent's room…………...………………………...$250.00 Total
< 2 > Pre-Built closets...........................Visitor & Parent's rooms………………………....$250.00 Each
< 1 > Computer Desks For....................Parent's room………………………………...........$200.00 Total
Future Projects 2:
< 2 > Trim Bathrooms……………… ..…….Sink Cabinets, Faucets, Shower Heads….............. $400.00
< 2 > Mirrors…………………………………Both Bathrooms and Hall Sinks……………............. $300.00
< > Paint rest of 2nd Floor…………….....Interior Walls…………………………………......…… $200.00
< > All flooring finished………………......Tiled……………………………………………………$2,500.00
This will complete the construction project except for the kitchen. Later after we have children we will finish the kitchen with your support and until then the host family will prepare meals from their kitchen.
Immediate needs following the construction completion.
4 Bunk beds ......................................... Estimated $250 each
They will have built in drawers under the lower bunk for their personal items.
Bedding for 8 twin beds .......................................... $30 each
need 2 pair for each for one set being washed and dried (with double pillow cases.)
8 Pillows ..................................................................$10 each
16 sets of wash clothes and towels .......................... $6/set
Toiletries for up to 8 boys ... bars of soap, shampoo, combs, tooth brushes and tooth paste, tooth brushes last about one month per child as there is no water pressure to systematically clean them properly.
Sleeping mats one per child .......................................................................... $10
Other items will be added as they are identified and priced.
When sending support make checks and money orders out to:
Compassion 4 Kids International
Send to:
Compassion 4 Kids International, Inc
11888 E Oak Hill Way Unit E
Henderson, CO 80640-7742
|
|
|